Construction and open cast site noise
Abstract
The key aim of this project is to ensure that reliable noise emissions data are included in a construction noise database, designed in the same manner as BS 5228.
Salford’s role is to investigate the normalisation of noise data to 10 metres with regards to plant having large dimensions.
Investigators
- Dr David Waddington
- Dr Andy Moorhouse
Location
National
Duration
January – June 2006
Sponsor
Industrial Collaborator
Measurements
Sound power of quarry plant in-situ
Publications
Client report Autumn 2006
Links
Defra 2006